Extra copies cannot fix every failure
When does redundancy improve an entire service?
Entering midway? Revisit How a short surge becomes repeated swings for the preceding worked example, or start here and use the explanation below.
Start with a concrete question
Original synthetic scenario. A service needs every serial stage to work. Each stage can have one component or two independent parallel components; a shared outage disables all.
Try the initial inputs, then write a prediction before changing one setting. All calculations run locally on your CPU.
What do you expect?
If each of three stages works 90% of the time, is the whole service also available 90%?
Change one thing. Inspect what happens.
- Compare one and three serial stages at 90% component availability.
- Add parallel copies and compute the two-failure probability for one stage.
- Add a 20% shared outage and identify the availability ceiling.
- Choose an improvement and explain which failure class it addresses and which it leaves unchanged.
Your settingsMechanism
Calculation belowEvidence
Compare outcomes
Compare the current results
Every bar starts at zero and uses the same numeric scale in this chart. The upper bound automatically adjusts to the largest current value (at least 1), so compare the numbers when changing inputs. Units and quantities come from each label; different kinds of quantity are not interchangeable. Displayed values are rounded to at most six significant digits.Follow the calculation
- Each component independently works with probability 0.9 outside shared outages.
- Each stage uses one component: availability 0.9.
- All 3 serial stages must work: 0.9^3 = 0.729.
- A shared outage disables the entire system with probability 0; final availability = (1 − 0) × 0.729 = 0.729.
Parallel redundancy can reduce independent failures, but a shared failure cause sets a ceiling that extra copies cannot eliminate.
Captures keep your inputs, prediction and observation. Results are recalculated from those inputs. Resetting inputs keeps your captures and challenge history.
Explain the mechanism
What the experiment explains
Original synthetic scenario. A service needs every serial stage to work. Each stage can have one component or two independent parallel components; a shared outage disables all.
A series system needs every stage. Under independence, multiply stage availabilities: 0.9³ = 0.729, or 72.9%.
Two parallel components fail together with probability 0.1²=0.01, so stage availability becomes 99%. Three such stages give 0.99³≈97.03% before shared outages.
A common cause breaks the independent-copy benefit. A 20% shared outage limits total availability to at most 80%, even with perfect components.
Read the relationship
Parallel-stage availability = 1 − (1−p)². System availability = (1−q) × stage availability^k. p is component availability, q shared-outage probability, k serial stage count.
Inspect the evidence
The numerical trace is recalculated from your current settings. Compare a controlled pair of trials before changing several inputs together. Inspect intermediate quantities as well as final metrics; state which assumptions make the comparison meaningful.
Boundaries of the model
- Independence outside the shared-outage state, instantaneous failover and perfect fault detection.
- Static probabilities, not repair-time forecasts or empirical reliability estimates.
Return to the systems thinking and operations course and project to connect this mechanism to the broader investigation.
Try a fresh case
Two independent components each work with probability 0.8. They are parallel backups, and an independent shared outage occurs with probability 0.1. What is system availability as a percentage?
This is a public practice check. Retries support learning; matching a number does not certify independent proficiency.
Take the investigation further
Choose any extension. These are project prompts for you to carry out; they are not automatically assessed.
School investigation
Enumerate success/failure cases for two components.
College investigation
Add imperfect failover and conditional failure dependence, then compare with this ideal baseline.
Workplace investigation
Create a reliability improvement brief separating independent failures, common causes, detection and recovery evidence.
Keep the evidence, choose your next step
Completion records your own decision that you have worked through this investigation. Practice checks and independent project evidence are separate.