Who Decides—and Who Answers?
Optional arithmetic and percentage refresher — return to this activity
Responsibility needs a decision someone can actually make. Separate who operates a service, who checks an output, who authorizes rollout and who handles an incident. A vendor contract or an AI suggestion does not automatically assume those roles for you.
Library request routing: fictional adoption pack
All people, records and numbers in this pack are authored teaching examples. They are not records or performance claims about real organizations.
- A1 · Twenty requests per month. Fictional monthly effort-equivalent costs: manual work 6 units/request; a fixed template 10 setup units + 2/request; bought service 40 fixed units + 4/request; built system 120 setup units + 3/request. All variable costs include the stated review step; these are teaching assumptions, not vendor prices.
- A2 · A vendor advertises 98% accuracy on 50 internally selected examples without case definitions. The library has no comparable independent evaluation yet. A fluent demonstration is not evidence on its requests.
- A3 · Public trial record: 8 of 8 standard requests routed correctly; 1 of 2 alternative-format requests routed correctly. Overall 9 of 10. The sample is too small to establish stable group performance.
- A4 · Librarian owns the service; a reviewer may hold a result; the service lead decides rollout or suspension. A procurement contact can request information but cannot waive the evidence gates.
- A5 · The proposed input includes names and personal notes that routing does not need. Use minimal fictional examples for this exercise. The service must offer an accessible manual route and a way to challenge an incorrect route.
- A6 · Exit brief: preserve approved records in a documented export format, test reopening them, retain a manual fallback and assign someone to revoke access after verified handover. Do not assume an export button guarantees a usable exit.
An overall average can hide who needs help
| Group | Correct / cases | Rate |
|---|---|---|
| Standard | 8 / 8 | 100% |
| Alternative format | 1 / 2 | 50% |
| Overall | 9 / 10 | 90% |
The overall 90% does not erase the alternative-format failure. The reviewer may hold a route, the librarian owns service recovery, and the lead may suspend use. The manual fallback must be usable by the affected person. Removing unnecessary personal notes addresses exposure, a separate problem from routing quality.
Worked example
A4 gives the librarian service ownership, the reviewer authority to hold a result and the service lead rollout authority. The procurement contact can gather evidence but cannot waive gates. This avoids treating a purchase as deployment approval.
Use the supplied records to check facts and calculations. Your written reasoning is retained for your review, not automatically graded. The final project uses a different case and separate review criteria.