Inspect the vendor denominator
Optional arithmetic and percentage refresher — return to this activity
A vendor’s percentage needs a task population, denominator, rubric and measurement conditions. A selected demo can reveal a capability without estimating production reliability. Compare alternatives on the same cases before treating their percentages as interchangeable.
Visitor service: fictional alternatives and evidence
All people, records and numbers in this pack are authored teaching examples. They are not records or performance claims about real organizations.
- D1 · Job: draft a 100-word visitor reply with correct opening hours and access instructions. Staff approve before sending. A deterministic hours template is an alternative; image generation does not answer a factual hours question.
- D2 · On the same 20 public trial requests, retrieved-draft system A has 18 fully correct replies, one wrong-hours reply and one missing-access reply. System B has 16 fully correct replies, including two wrong-hours and two missing-access replies. Each failed reply has just its named fault. These are distinct alternatives, not pooled evidence.
- D3 · Total response times in seconds, in increasing order: A = [1,1,2,2,2,2,3,3,3,3,4,4,4,5,5,6,6,7,9,12]; B = [1,1,1,1,1,2,2,2,2,2,2,3,3,3,3,3,4,4,5,6]. First-token times were not recorded. A streaming demo cannot supply those missing measurements.
- D4 · Cost assumptions for a batch of 20: A setup 10 effort units, generation 1 per reply, review 2 per reply and repair 4 for each of its 2 failed replies. B setup 6, generation 1 per reply, review 3 per reply and repair 4 for each of its 4 failed replies. Template quality and full operating cost are unknown until a matched trial.
- D5 · Vendor demo reports 99% accuracy on 100 selected tasks with no task list, rubric or failure table. It is separate from D2. A proposed service requires at least 18/20 fully correct drafts, no wrong-hours replies after review, and at least 19/20 full responses within 8 seconds. Quality after review was not measured in D2.
- D6 · Pilot owner can pause sending, restore the current manual process and delete copied visitor data on schedule. A separate stress test changes the hours source; it is not included in the 20-request totals.
Check each gate separately
| Required gate | System A | System B |
|---|---|---|
| Correct drafts | 18/20 | 16/20 |
| Full replies within 8 s | 18/20 | 20/20 |
| Correct after human review | Unknown | Unknown |
| Time to first token | Not recorded | Not recorded |
A is more accurate on these drafts; B meets more deadlines. Neither row tells us whether the timely replies were also correct, because per-request correctness was not supplied. The 19/20 deadline gate rejects A; missing post-review evidence prevents treating either system as approved.
Worked example
D5’s 99/100 selected demo is separate from D2’s 20 service requests. A’s 18/20 is 90% on that cohort and B’s 16/20 is 80%. The vendor sample cannot be combined with A’s cohort or used to infer template quality.
Check the boundary
Keep the selected vendor demo separate from the matched service cohort. Planned stress cases do not belong in existing totals, and repeated development inspection does not create untouched evaluation.