Back to Generative and instruction-conditioned policies
Shared AI lesson · Generative and instruction-conditioned policies
Understand plan and control
- Starting information
Planner asks to grasp, then lift
- Relationship or operation
Controller verifies grasp completion first
- Consequence
Lift starts only after a valid receipt
A high-level plan names subgoals; motor control realizes them. Dependencies must use observed completion, not assumed success.
The question
A robot can issue a push command before it has reached the object. A plausible high-level plan is not evidence that its prerequisites were achieved.
Try it and inspect what changed
Inject a failed reach and inspect both retries and the unresolved handoff.
Compare normal and failed traces. Count attempted skills separately from completed tasks. Explain why retrying a deterministic failed reach may not help until the cause changes. Propose one additional observation or fallback, then state a work budget and a condition that ends recovery.
The calculation in words
A reach receipt requires tool-object distance at most 0.04 m. Push requires an accepted reach and ends only when object-goal distance is at most 0.05 m. Retraction requires a tool-object separation of at least 0.2 m. These thresholds belong to the skill contracts rather than the policy’s confidence.
Keep the conclusion within the evidence
The example supervisor composes reach, push and retract. Failed reach allows at most two attempts and then an unresolved handoff. It never upgrades an unexecuted push to success. This visible trace is a programmed contract example; the separate workbench trains the motor imitation policy.
This is not learned task decomposition or language planning. The planar permanent-contact plant deliberately omits the contact-establishment mechanics; the hierarchy trace exposes that missing boundary rather than pretending the motor experiment demonstrates it.
You can explore every lesson directly. Completing this page, submitting a project report and demonstrating understanding on a separate case are different records. Optional code is available in the robot-learning studio; it does not increase guided lesson completion requirements.
Full worked explanation, calculations and control definitions
Use this reference for the detailed mechanism and control meanings. Derivations explicitly marked optional are enrichment.
Start with the task
A robot can issue a push command before it has reached the object. A plausible high-level plan is not evidence that its prerequisites were achieved.
Mechanism and units
A reach receipt requires tool-object distance at most 0.04 m. Push requires an accepted reach and ends only when object-goal distance is at most 0.05 m. Retraction requires a tool-object separation of at least 0.2 m. These thresholds belong to the skill contracts rather than the policy’s confidence.
The example supervisor composes reach, push and retract. Failed reach allows at most two attempts and then an unresolved handoff. It never upgrades an unexecuted push to success. This visible trace is a programmed contract example; the separate workbench trains the motor imitation policy.
Work through the evidence
Compare normal and failed traces. Count attempted skills separately from completed tasks. Explain why retrying a deterministic failed reach may not help until the cause changes. Propose one additional observation or fallback, then state a work budget and a condition that ends recovery.
Inject a failed reach and inspect both retries and the unresolved handoff.
What this experiment can establish
This is not learned task decomposition or language planning. The planar permanent-contact plant deliberately omits the contact-establishment mechanics; the hierarchy trace exposes that missing boundary rather than pretending the motor experiment demonstrates it.
Keep collection, fitting, frozen execution and interpretation as separate records. Save the configuration and complete result, including failures, in the robot-learning project. Report submission checks required evidence and text presence; reasoning and implementation quality need independent review.