Add setup, review and repair
Optional arithmetic and percentage refresher — return to this activity
A pilot is a bounded trial, not a quiet commitment to rollout. Its owner states quality gates, review duties, resource limits and rollback steps before seeing results. A go decision needs all required evidence; an unmet or unknown gate can justify revise or stop.
Visitor service: fictional alternatives and evidence
All people, records and numbers in this pack are authored teaching examples. They are not records or performance claims about real organizations.
- D1 · Job: draft a 100-word visitor reply with correct opening hours and access instructions. Staff approve before sending. A deterministic hours template is an alternative; image generation does not answer a factual hours question.
- D2 · On the same 20 public trial requests, retrieved-draft system A has 18 fully correct replies, one wrong-hours reply and one missing-access reply. System B has 16 fully correct replies, including two wrong-hours and two missing-access replies. Each failed reply has just its named fault. These are distinct alternatives, not pooled evidence.
- D3 · Total response times in seconds, in increasing order: A = [1,1,2,2,2,2,3,3,3,3,4,4,4,5,5,6,6,7,9,12]; B = [1,1,1,1,1,2,2,2,2,2,2,3,3,3,3,3,4,4,5,6]. First-token times were not recorded. A streaming demo cannot supply those missing measurements.
- D4 · Cost assumptions for a batch of 20: A setup 10 effort units, generation 1 per reply, review 2 per reply and repair 4 for each of its 2 failed replies. B setup 6, generation 1 per reply, review 3 per reply and repair 4 for each of its 4 failed replies. Template quality and full operating cost are unknown until a matched trial.
- D5 · Vendor demo reports 99% accuracy on 100 selected tasks with no task list, rubric or failure table. It is separate from D2. A proposed service requires at least 18/20 fully correct drafts, no wrong-hours replies after review, and at least 19/20 full responses within 8 seconds. Quality after review was not measured in D2.
- D6 · Pilot owner can pause sending, restore the current manual process and delete copied visitor data on schedule. A separate stress test changes the hours source; it is not included in the 20-request totals.
Check each gate separately
| Required gate | System A | System B |
|---|---|---|
| Correct drafts | 18/20 | 16/20 |
| Full replies within 8 s | 18/20 | 20/20 |
| Correct after human review | Unknown | Unknown |
| Time to first token | Not recorded | Not recorded |
A is more accurate on these drafts; B meets more deadlines. Neither row tells us whether the timely replies were also correct, because per-request correctness was not supplied. The 19/20 deadline gate rejects A; missing post-review evidence prevents treating either system as approved.
Setup is a one-time cost; review repeats for every request. To allocate 10 setup effort units across a planned 20-request trial, divide 10 by 20: 0.5 per request. This allocation is called amortization. If only ten requests occur, setup is 1 per request. Keep the batch total alongside the per-request estimate, and state the assumed workload.
Worked example
A’s batch cost is 10 + 20 × 1 + 20 × 2 + 2 × 4 = 78 effort units. B’s is 6 + 20 × 1 + 20 × 3 + 4 × 4 = 102. Lower cost does not prove approval: A misses the 19/20 latency gate, and post-review wrong-hours quality is unknown for both.
Check the boundary
Costs are effort-equivalent assumptions, not market prices. Post-review correctness remains unknown. A pilot recommendation must name an owner and a working fallback rather than treating a favorable total as deployment approval.