Beta

Sync to cloud

Uses your current signed-in YoolVi account. A Learn profile is not required.

Upload a snapshot of this browser’s saved lesson work across all subjects, including notes, experiments, journal and review history. Existing guest work is included only when you confirm below. This does not upload account credentials or award XP.

Sync uploads to your private account; it does not automatically merge or replace this device’s work. On another device, download the cloud copy and use My Learning’s backup import. The previous cloud snapshot is retained when a new one replaces it.

Export or import this device’s work

No background uploads. Edits made after a snapshot need another sync. On shared devices, work is bound to the first account observed by cloud sync; another account must use a separate browser profile. Keep your own downloaded backup too.

Learning preferences

Make learning more comfortable. Changes apply immediately.

Enlarges page content, including diagrams and their labels. You can also use your browser’s zoom.

Choose the colours that are easiest for you to distinguish. Applies to lesson diagrams and lab plots. Labels, shapes, hatching and line patterns also distinguish meanings. Source photographs and raw image brightness stay unchanged; mask-only views are available for image overlays.

ExampleComparisonSample link

Saved in this browser on this device. Preferences are separate from progress backups.

Pick a Metric That Matters

Back to AI for Business: Test the Case

Optional arithmetic and percentage refresher — return to this activity

A metric is a defined quantity used to judge an action. Absolute error measures distance from demand; decision loss weights leftovers and shortages differently. Choose the task, units, period and consequences before comparing systems.

Café ordering: authored forecast pack

All people, records and numbers in this pack are authored teaching examples. They are not records or performance claims about real organizations.

  • B1 · Four public practice days D1–D4: observed demand 12, 8, 15, 10 portions. All requests could be supplied, so these are demand observations, not sales censored by stockouts.
  • B2 · Last-week baseline forecasts: 10, 10, 12, 12. Candidate-model forecasts: 14, 10, 16, 12. Both were fixed before the outcomes in this fictional scenario. Candidate outputs are authored; no AI model is trained or called here.
  • B3 · Order exactly the forecast with no carryover. Leftovers = max(order − demand, 0); shortages = max(demand − order, 0). Each leftover costs 1 effort-equivalent unit; shortage cost is adjustable from 0 to 100. These are assumptions, not prices.
  • B4 · Mean absolute error (MAE) is the sum of absolute errors divided by days. These four cases are exposed development practice; repeated inspection is not independent evaluation.
  • B5 · Promotion and warmer weather coincided with higher demand. No randomized comparison was made. Forecast quality does not identify the promotion’s causal effect.
  • B6 · A proposed pilot must record demand including unfilled requests, leftovers, review effort and operating loss on comparable days, with quality and stopping gates declared before seeing results.
Authored explanation · fixed practice values, separate from your saved experiment

Equal misses can have unequal consequences

Demand: 12 portions

Forecast 10 → 2 short
2 × 4 = 8 loss units

Same demand

Forecast 14 → 2 left over
2 × 1 = 2 loss units

Both absolute errors are 2 portions. “Absolute” means size without direction. Mean absolute error (MAE) adds those sizes and divides by the number of days; loss instead weights each consequence.

All four public days at shortage cost 4
MethodMAE (portions)Loss (units)
Baseline2.2524
Candidate1.757

Changing the shortage cost leaves forecasts, demand and MAE unchanged. Review, setup and other operating costs are outside these lesson totals; a project may require additional costs.

Worked example

On D1, ordering 10 for demand 12 creates two shortages; ordering 14 creates two leftovers. Both absolute errors are 2 portions. At shortage cost 4 and leftover cost 1, the losses are 8 and 2 units. Equal error can have unequal consequences.

These are authored public practice cases. Retain your reasoning and uncertainty. A completed page does not establish independent proficiency.