Find the Costs You Missed
Optional arithmetic and percentage refresher — return to this activity
A fixed cost occurs for a batch or period, such as setup. A variable cost grows with usage, such as review per request. An effort total can omit fees, waiting and maintenance; name those omissions rather than pretending the number is complete.
Service desk trial: fictional workflow pack
All people, records and numbers in this pack are authored teaching examples. They are not records or performance claims about real organizations.
- F1 · Ten public practice requests, same task mix: the manual baseline used 80 minutes drafting, 20 reviewing and 20 repairing errors. Total hands-on work: 120 minutes. Nine final outputs were usable; no critical failures were recorded.
- F2 · Assisted draft workflow: 30 minutes drafting, normally 3 minutes review per request, 20 minutes repair and 30 minutes setup for this batch. Nine final outputs were usable; one unresolved disclosure of the wrong customer detail is a critical failure. All cases and outcomes are authored.
- F3 · Roles: intake clerk checks the request; assistant proposes a draft; reviewer compares it with permitted source records; service lead authorizes release. The reviewer can stop a draft; nothing here sends real messages.
- F4 · Exception trace: an action timed out. Receipt lookup for the same request ID shows “completed.” Repeating the action could create a duplicate. In a second trace the receipt cannot be found, so the outcome remains unknown.
- F5 · Trial gates agreed before comparison: at least 9 of 10 usable outputs, zero unresolved critical failures, and total batch work below 120 minutes. The ten exposed cases support development practice, not an untouched final evaluation.
- F6 · Count setup, review and repair for both methods. Hands-on minutes are not elapsed turnaround time. Waiting, service fees and broader operating costs are not measured by this small trial.
Check the whole batch and every gate
| Work | Manual | Assisted |
|---|---|---|
| Draft | 80 | 30 |
| Review | 20 | 10 × 3 = 30 |
| Repair | 20 | 20 |
| Setup | 0 | 30 |
| Total | 120 | 110 |
- Usable outputs: 9/10 → count gate passes.
- One unresolved critical failure → zero-failure gate fails.
- 110 minutes < 120 → effort gate passes.
The complete decision fails because all gates must pass. A 50-minute drafting reduction becomes only a 10-minute measured saving, and neither saving clears the critical failure.
Worked example
F2’s 30-minute setup is charged once to this ten-request batch. At three review minutes each, review adds 30. Repeating the same batch does not prove setup disappears, and hands-on minutes do not measure how long a requester waited.
Use the supplied records to check facts and calculations. Your written reasoning is retained for your review, not automatically graded. The final project uses a different case and separate review criteria.