Step 1 of 6· Calculate tables plus signs
Calculate tables plus signs
Check numerical claims with your own calculation. Also check the rule the number is supposed to satisfy. A correct calculation does not make an over-budget plan acceptable.
Where did the missing 24 credits go?
8 tables × 12 credits = 96 credits
→Add fixed signs: 96 + 24 = 120 credits
→Budget remaining: 150 − 120 = 30 credits
Worked example
Eight tables cost 12 credits each; signs cost 24 credits. First calculate 8 × 12 = 96. Then add 24 to get 120 credits. Against a 150-credit budget, 150 − 120 = 30 credits remain. A draft saying 96 total forgot the signs.
Why this helps
Write the calculation and its units. A budget result covers the listed costs only; it does not establish venue availability or safety.