Build, Buy, or Keep It Simple?
Optional arithmetic and percentage refresher — return to this activity
Building, buying and using a simple rule have different setup and ongoing demands. Compare them over the same number of requests and include review in each. A cheaper cost estimate does not establish adequate quality or accessibility.
Library request routing: fictional adoption pack
All people, records and numbers in this pack are authored teaching examples. They are not records or performance claims about real organizations.
- A1 · Twenty requests per month. Fictional monthly effort-equivalent costs: manual work 6 units/request; a fixed template 10 setup units + 2/request; bought service 40 fixed units + 4/request; built system 120 setup units + 3/request. All variable costs include the stated review step; these are teaching assumptions, not vendor prices.
- A2 · A vendor advertises 98% accuracy on 50 internally selected examples without case definitions. The library has no comparable independent evaluation yet. A fluent demonstration is not evidence on its requests.
- A3 · Public trial record: 8 of 8 standard requests routed correctly; 1 of 2 alternative-format requests routed correctly. Overall 9 of 10. The sample is too small to establish stable group performance.
- A4 · Librarian owns the service; a reviewer may hold a result; the service lead decides rollout or suspension. A procurement contact can request information but cannot waive the evidence gates.
- A5 · The proposed input includes names and personal notes that routing does not need. Use minimal fictional examples for this exercise. The service must offer an accessible manual route and a way to challenge an incorrect route.
- A6 · Exit brief: preserve approved records in a documented export format, test reopening them, retain a manual fallback and assign someone to revoke access after verified handover. Do not assume an export button guarantees a usable exit.
Separate the fixed charge from each request
| Option | Fixed + usage | Total |
|---|---|---|
| Manual | 0 + 6 × 20 | 120 |
| Template | 10 + 2 × 20 | 50 |
| Buy | 40 + 4 × 20 | 120 |
| Build | 120 + 3 × 20 | 180 |
The template has the smallest stated total. Quality has not been established for each option, so this is a cost comparison rather than an adoption approval. A vendor’s selected demonstration is not another row in this trial.
Worked example
At twenty monthly requests, A1 gives manual 6 × 20 = 120 units; template 10 + 2 × 20 = 50; buy 40 + 4 × 20 = 120; build 120 + 3 × 20 = 180. These fictional assumptions exclude costs not specified in the pack.
Use the supplied records to check facts and calculations. Your written reasoning is retained for your review, not automatically graded. The final project uses a different case and separate review criteria.